Christophe Suire

Institut de Physique Nucléaire   (IPN)
15 rue Georges Clemenceau
Bat 100M, Bureau M125
F-91406 ORSAY cedex
Phone : +33 (0)1 69 15 51 39
Fax      : +33 (0)1 69 15 64 70




Me contacter au CERN :
Portable : 162257 (ou 162555)

[hors du réseau CERN faire : +4176487αβγδ]
Bureau 26-R002 : 79056
Poste Muon Tracking dans ACR : 77558
Algeco au point 2 : 70458
[hors du réseau CERN faire :
+4122767αβγδ]

 

 

Experiment: ALICE @ LHC

 

Documentation:
                                               » ALICE Run Coordination pages (link)
                                              
» for shifters (frequently updated): MCH twiki
                                                            Everybody is encouraged to comment and to participate!
                                              
» general items : use the CERN TWiki for Alice Dimuon Tracking

August-September 2009 Cosmic run         
                                              
»  Data taking Screen  (who's taking data) and  (MCH+MTR) data taking efficiency (pdf)
                                              
»  Current Run List  (csv)  and its simplified version (txt)
                                                          
Production status link
                                              
»  The first reconstructed tracks with dipole magnet on (Fig1,Fig2).
           
March-April 2009 Cosmic run   
                                              
»  Debriefing Meeting 21 April 2009  (indico)
                                              
»  Official Run List  (xls)
                                              
»  MTR and MCH SLIMOS  for the cosmic run :  SLIMOS planning
                                              
»  Meeting on Cosmic run preparation and planning (see slides here)

Diary of the May2008 Cosmic run: ppt / pdf link
                                              
»  Preparation and ToDoLists : ppt
                                              
»  Planning for Cosmic Run III (from P.Kuijer) : txt
                                                          
Latest version of MTR and MCH planning.

Diary of the February-March 2008 Cosmic run: ppt / pdf link
                                              
» Readout time measurements (xls) and interpretation (doc)
                                              
» First track in the Dimuon Spectrometer: pdf
                                              
» 5th_commissioning_workshop_MUON_TRK.ppt (1 & 3 march 2008)

from_trigger_small

orthographic_small

 
track_angle_beam_axis_small

track_top_small

trackpoints_line_small

XZ-projection_small


Diary of the December 2007 Cosmic run: ppt-link
                                              
» 4th_commissioning_workshop_MUON_TRK.ppt (16-17 january 2008)